Non-invasive, non-intrusive and non-destructive pipeline inspection without disrupting or manipulating water supply. Including suitability for asbestos cement pipelines, accurate measurements over extended pipeline lengths, and the ability to provide a reliable basis for asset management decisions.
Published
08.09.2026
Open for bids
08.09.2026
Conditions updated
08.09.2026
RWK Programma
Open for bids·Oct 29
Raamovereenkomst voor de levering, installatie en onderhoud van camerasystemen
Closed·Oct 4
Samenwerking in de keten
Closed·Sep 21
Levering brandkranen en leidingmaterialen van gietijzer en RVS
Open for bids·Aug 22
Sanitaire voorziening
Closed·Jul 20
Raamovereenkomst UPS-systemen: levering en onderhoud t.b.v. IA
Closed·Jul 14
Hiring inspectors for Gasunie inspection of pressurized gas transport related equipment and pressure containing components
Closed·Jul 29
Radar-based satellite inspection of underground pipeline routes
Closed·Jun 21
Framework agreement for inline inspections of transport pipelines
Awarded·Apr 4
In-line Inspection Services (Cleaning/Gauging/Geometric and Magnetic Flux Leakage pigging and reporting services)
Closed·Apr 1
Leidinginspecties Ruwwater Systeem Biesbosch Noord
Closed·Mar 8
Raamovereenkomst reiniging en inspectie van hoofdrioleringen Watersamenwerking As50
Awarded·Feb 12
31103897 Tilburg 3 (TB3)
Awarded·Nov 1
Outsourcing salaris administratie
Awarded·Nov 1
Femtosecond laser system with tunable OPA
Open for bids·Nov 1
End user devices
Awarded·Nov 1
31187282: Groot onderhoud A2 en A6 (2025, 2026)
Awarded·Nov 1
Monitor Bevolkingsonderzoek naar Kanker (BVOK)
Awarded·Oct 31
Create an account to explore this tender and find similar opportunities.