Published
20.08.2026
Open for bids
20.08.2026
Deadline
24.08.2026
Build of an injection mold design of the inner sun visor for future spacesuit helmet designs
Active
Schneider Electric HW & Support
Active
EGS Spares for CCF - Differential Pressure Transmitters
Active
Snow and ice removal services for NASA IV&V Facility. 6 months of services needed (November 2026 - April 2027)
Active
Astrion EPOCH 650 Digital Ultrasonic Flaw Detector
Active
OMAX ProtoMax Abrasive Waterjet
Active
© 2026 SIA «Vietne». All rights reserved.