Napier City Council is undertaking the installation of a new 100mm (125mm OD) watermain on Barker Road and requires the aid of a sub-Contractor to install a new 100mm (125mm OD) watermain pipe using trenchless construction methods while minimising disruption to the surrounding area. In summary, the Scope of Work includes: • Potholing • Excavation of launch and receiving pits. • Supply all drilling plant and equipment. • Pipe welding. • Complete horizontal directional drilling (HDD) along the nominated alignment. • Install the supplied watermain pipe within the drilled bore. • Comply with all project-specific health and safety requirements.
Published
17.08.2026
Open for bids
17.08.2026
Deadline
10.09.2026
Future ERP - System Integrator, Business Integrator, and Quality Assurance
Pākihikura (Opotiki) Harbour Dredging Contract - EOI
CWTP Belt Press Polymer Plant
Te Nukutai o Tapoa Naval Point Lyttelton Recreation Ground Sports Field Lighting
ICT Services Solution for Rolleston College
Meeting Room Modernisation RFP
© 2026 SIA «Vietne». All rights reserved.