"The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: • Electrical install ready for Electricty North West power connection for cabin installation • Lighting cable diversion works and any survey works in associated with this • Installing lights on the cabins/storage areas • Lights on the hoarding at woodhouse lane • Install Power supplies to cabins from the MDU • Some minor lighting design to support the above"
Aktīvs
23.02.2026
Published
26.02.2026
Deadline
13.03.2026
Manchester International Airport - Shotcrete works
Open for bids·Oct 6
Manchester International Airport - OLE Phase 3 Works
Closed·Sep 30
Manchester International Airport - Demolition Works
Closed·Aug 27
Manchester International Airport - Permanent Way Works
Closed·Aug 19
Manchester International Airport - Precast Concrete Beams
Closed·Jul 13
Manchester International Airport - Steel Parapet Bridge Fascia
Closed·Jul 13
DDaT26396 - Software Subscription
Awarded·Oct 14
Digital Blue Print Fast Track Validation
Awarded·Oct 14
CA18415 - RFQ2026/33 - NMANDD PEACEPLUS Thriving Together PEACEPLUS 3.2 Creative Cultures After school
Awarded·Oct 14
WSCC Route 10011 - Ifield & Crawley to Meath School - 4 Seats, 2 Passengers
Awarded·Oct 14
715865522 - Voyager Legal Support Contract (CCS RM6360) LOT 2 AWARD
Awarded·Oct 14
Forensic Case Management System
Awarded·Oct 14
Create an account to explore this tender and find similar opportunities.