Supply and installation / construction services for new culverts across the Karamea Highway Bluff Rd section. Work includes supply and trenching and backfill/compaction for approximately 36m of 900dia Class 4 Concrete pipe, 28m of 750dia Class 4 Concrete pipe and 15m of Class 4 Concrete 600dia pipe. Work will include associated precast concrete headwalls and rock rip rap for each of the five culvert crossings. Trench surface is to be reinstated with a two coat grade 3/5 chip seal. Trench depths will vary between 2m to approximately 3m.
Published
18.08.2026
Open for bids
18.08.2026
Deadline
15.09.2026
RFT - Main Contractor for Design, Supply, & Installation of a Covered Outdoor Learning Canopy at Waimea Intermediate School, Nelson
Registration of Interest - Main Contractor - Block 6 Cladding Replacement - Thorrington School
RFT - Main Building Contractor for Blocks 1, 2, 3, 4 - Roofing Repairs at Tui Glen School, Stokes Valley, Lower Hutt
Roofing Contractor for Blocks A,B,C,D,E,F,G,H,L,O,Q,SB,T,U and 8 Roof Works and AC Inverter Relocation at Te Haikura A Kiwa
Main Contractor for the Blocks 4 and 6 DQLS and ILE Upgrade at Wapipi School
14777 SH38 Frasertown Bridge Deck Strengthening
ROI - Otara Wastewater Network Upgrade Design Services
Suppliers of Independent Asset Management Reviews
RFT - Main Contractor for Design, Supply, & Installation of a Covered Outdoor Learning Canopy at Waimea Intermediate School, Nelson
High Tech Imaging Services
Elective Surgery Services
Registration of Interest - Main Contractor - Block 6 Cladding Replacement - Thorrington School
© 2026 SIA «Vietne». All rights reserved.