Deadline
10.02.2025
Published
10.03.2026
Awarded
10.03.2026
Consultancy Services for Independent Audit of the Resettlement Action Plan (RAP) for the Muvumba Dam Project
Active
Maintenance and repair of flood control infrastructures (Retention dams, dykes, ponds, water channels, retaining wall and related structures
Active
Stormwater master plan study for Musanze and Rubavu cities and development of guideline to linkage the flood maps into spatial plans of…
Active
Stormwater master plan study for Musanze and Rubavu cities and development of guideline to linkage the flood maps into spatial plans of districts
Active
Design and printing and promotion materials
Active
Design and printing and promotion materials
Active
© 2026 SIA «Vietne». All rights reserved.