2.1 Background a. Based on the condition assessment completed by Andrew Golding dated 8 August 2024, the project is focused on improving the weathertightness performance of the Library building through remediation of the external building envelope. i. The works include replacement of existing wall cladding systems, installation of new cavity-based cladding and associated flashings. ii. Replacement of soffit linings, and reinstatement of affected rainwater goods and external building elements. iii. These works are intended to address identified weathertightness deficiencies and improve the long-term durability and performance of the building. iv. The recommended works are intended to improve the overall weathertightness performance of the building, address identified defects, reduce the risk of ongoing water intrusion, and protect the long-term integrity of the building structure. 2.2 Required Solution i. Removal of the existing wall cladding to the framed external walls of the Library and installation of new cavity-based Linea weatherboard and Axon panel cladding systems, including new wall underlay, cavity battens, flashings, seals, fixings and associated weatherproofing components. ii. Removal of asbestos-contaminated cladding panels and soffit linings in accordance with the applicable asbestos health and safety requirements, including off-site disposal at an approved facility. iii. Installation of new soffit linings over the existing framing, with the existing framing made good as required to receive the new work. iv. Existing windows, roofing, roof structure, masonry walls, internal layouts, finishes and building systems are to remain, unless specifically affected by or identified for alteration as part of the documented works. v. The school will remain operational throughout construction. The Contractor will be required to securely isolate the work area with temporary fencing and maintain existing services and compliance schedule systems, and coordinate deliveries so they do not occur during class or break times. vi. Known site constraints include working within an operational school, managing asbestos-containing materials, maintaining safe access and egress, protecting existing services and building elements, and verifying existing site dimensions, framing and conditions before commencing work.
Published
14.10.2026
Open for bids
14.10.2026
Deadline
12.11.2026
Main Contractor for Fencing Project at Te Pi'ipi'inga Kākano Mai I Rangiātea Kura
Open for bids·Oct 20
Main Contractor for the Block 4 Cladding Remediation and Replacements at Point View School
Open for bids·Oct 20
Main Construction Contractor for Blocks AA3, E & G Roof Repairs Package B at Tauranga Girls’ College
Open for bids·Oct 20
Main Contractor for the Blocks A D H L M N S 5: Heating and Switchboards Upgrade at Mangere College
Open for bids·Oct 20
Main Building Contractor for Indoor Outdoor Learning Project at Onekawa School
Open for bids·Oct 20
Main Contractor for the Blocks A, H, L, M, N, S, T: Boiler Roofing and Site CAD Plan at Mangere College
Open for bids·Oct 20
Main Contractor for Fencing Project at Te Pi'ipi'inga Kākano Mai I Rangiātea Kura
Open for bids·Oct 20
Main Contractor for the Block 4 Cladding Remediation and Replacements at Point View School
Open for bids·Oct 20
Main Construction Contractor for Blocks AA3, E & G Roof Repairs Package B at Tauranga Girls’ College
Open for bids·Oct 20
Main Contractor for the Blocks A D H L M N S 5: Heating and Switchboards Upgrade at Mangere College
Open for bids·Oct 20
Main Building Contractor for Indoor Outdoor Learning Project at Onekawa School
Open for bids·Oct 20
Main Contractor for the Blocks A, H, L, M, N, S, T: Boiler Roofing and Site CAD Plan at Mangere College
Open for bids·Oct 20
Main Contractor for Fencing Project at Te Pi'ipi'inga Kākano Mai I Rangiātea Kura
Open for bids·Oct 20
Main Contractor for the Block 4 Cladding Remediation and Replacements at Point View School
Open for bids·Oct 20
Main Construction Contractor for Blocks AA3, E & G Roof Repairs Package B at Tauranga Girls’ College
Open for bids·Oct 20
Main Contractor for the Blocks A D H L M N S 5: Heating and Switchboards Upgrade at Mangere College
Open for bids·Oct 20
Main Building Contractor for Indoor Outdoor Learning Project at Onekawa School
Open for bids·Oct 20
Main Contractor for the Blocks A, H, L, M, N, S, T: Boiler Roofing and Site CAD Plan at Mangere College
Open for bids·Oct 20
Create an account to explore this tender and find similar opportunities.