Block 3 Toilets: removal of internal load-bearing walls, sanitary fittings, in-ground shower, internal wall linings and flooring, and reconfiguration to form 2 new student toilets, a staff toilet, an accessible bathroom and a new laundry, with new sanitary fittings, wet wall linings, vinyl flooring, replacement timber beams in place of the demolished load-bearing walls, and a new exterior door and ramp. Block 3 Room 20: removal of an existing partition wall and the existing operable wall, new vinyl flooring, new heat pumps, and new Autex Composition wall board.
Published
14.09.2026
Open for bids
14.09.2026
Deadline
12.10.2026
ROI - Main Contractor for Kaipara College - D: Refurbishment Works
Registration of Interest - Kerikeri High School - Main Contractor - Roofing Works
Blocks 1-5,9,12,13 Heating to Classrooms and Administration at Milson School
Sitewide Wastewater Investigation and Remediation at Milson School
Roofing Contractor for Blocks A,B,C,D,E,F,G,H,L,O,Q,SB,T,U and 8 Roof Works and AC Inverter Relocation at Te Haikura A Kiwa
Main Contractor for the Blocks 4 and 6 DQLS and ILE Upgrade at Wapipi School
ROI - Main Contractor for Kaipara College - D: Refurbishment Works
Roofing Contractor for Blocks A,B,C,D,E,F,G,H,L,O,Q,SB,T,U and 8 Roof Works and AC Inverter Relocation at Te Haikura A Kiwa
Main Contractor for the Blocks 4 and 6 DQLS and ILE Upgrade at Wapipi School
14777 SH38 Frasertown Bridge Deck Strengthening
Registration of Interest - Kerikeri High School - Main Contractor - Roofing Works
ROI - Residential Development – Lead Consultant Team
Suppliers of Independent Assess Management Reviews
Te Kura HRIS RFI
Blocks 1-5,9,12,13 Heating to Classrooms and Administration at Milson School
Sitewide Wastewater Investigation and Remediation at Milson School
ROI - Main Contractor for Kaipara College - D: Refurbishment Works
Roofing Contractor for Blocks A,B,C,D,E,F,G,H,L,O,Q,SB,T,U and 8 Roof Works and AC Inverter Relocation at Te Haikura A Kiwa
© 2026 SIA «Vietne». All rights reserved.