The Board or Trustees for Bradford School are seeking to engage a suitably qualified and experienced main contractor to deliver the proposed weathertightness remediation of the Library building. Work involves the replacement of the exterior cladding and joinery, alterations to exterior ground levels (strip drains), and the installation of a subfloor vapour barrier.
Published
20.08.2026
Open for bids
20.08.2026
Deadline
22.09.2026
Main Contractor for Block A Toilet Remodels at Limehills School
Active
ROI for Main Contractor for Design & Build Walkway Canopy Replacement and Minor Roof Remedials at Whangarei Intermediate School
Active
Main Contractor for Blocks E&I re-roof project at Taupo-nui-a Tia College
Active
Main Contractor for Block O, P, X, Y: OLE, Decking Replacement and WT Remediation at Peachgrove Intermediate School
Active
Main Contractor for Block G Student WC Upgrade and Acoustic Wall Covering Replacement
Active
Main Contractor for Fencing and Carpark works at Waterloo School (Wellingon)
Active
© 2026 SIA «Vietne». All rights reserved.