The works are to install dropped crossing points with concrete buff tactile paving at the following locations as detailed on drawings SPM- HC - S106 -120 -24-100-000 SPM - S106 -120 -24 - 100 -001a Suppliers are required to price the BOQ and include for all traffic management. It is highly recommended that the PCI pack is studied, and a site visit takes place before submitting quote. A proposed programme of work should also be submitted with your tender. These works are being funded, delivered and managed through the Herefordshire S106 Team directly. S106 contributions by their very nature are a finite budget which require the project to obtain a high level of value engineering at every stage of the project's lifecycle.
Deadline
12.03.2026
Published
15.05.2026
Awarded
15.05.2026
Revenue & Benefits System Modules
Active
Provision of a Digital Payment Platform for the Herefordshire Council Crisis and Resilience Fund
Active
Award of Contract for the provision of an Adult Social Care Service Diagnostic
Active
Award notice for commission of a cloud-based and offline mobile solution and associated services for a Field Management System, required to support Highways Infrastructure and maintenance projects.
Active
Award notice for Printing, Scanning and Copying, including Equipment Lease Agreement
Active
Room, Desk and Visitor Management
Active
© 2026 SIA «Vietne». All rights reserved.