.The Southern African Development Community (SADC) region faces significant challenges in accessing Sexual and Reproductive Health and Rights (SRHR), which hinder sexual and reproductive well-being. One of the reasons for these challenges is the lack of quality reproductive health commodities. The identified key constraints limiting access to those commodities include: 1. Lack of Pooled Procurement: The absence of a regional pooled procurement mechanism leads to limited access and availability of Sexual and Reproductive Health (SRH) commodities. Fragmented procurement processes across different central medical stores (CMS) cause delays, uneven distribution, and hinder efficient acquisition of SRH commodities. 2. Lack of regional Regulatory Harmonisation: There is a lack of regulatory harmonization of National Regulatory Authorities (NRA) in the region hindering the registration of SRH commodities across different member states in the SADC region. Divergent regulatory frameworks make it difficult to ensure consistent quality and safety standards for SRH commodities, resulting in delays and inconsistencies in their availability of qualitative SRH commodities 3. Insufficient Local Production Capacities: The region"s reliance on imported SRH commodities exposes it to supply chain vulnerabilities and price fluctuations. A stronger local manufacturing base is needed to ensure consistent and affordable access to SRH commodities, reducing dependence on external suppliers. To tackle these challenges, the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ) through the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) support SADC in their endeavor to increase the availability of essential, underused, or hard-to-access quality-assured SRH commodities by promoting pooled procurement mechanisms, supporting regulatory harmonization, and promoting local production
Published
22.09.2026
Awarded
22.09.2026
CT Systeme für Krankenhäuser in der Ukraine
81318825 EPSG Expert Pool
Vierunddreißig (34) neue Minibusse (Social Taxis) mit Rollstuhllift inkl. optionaler Aufstockung um zehn (10) weitere neue Minibusse (Social Taxis) mit Rollstuhllift
Fünfzehn (15) neue Traktoren inkl. Anbaugeräte
AFP Analysis&Options Consultancy
10038931 - Validation of a Climate Change- GBV Stress Scale
Allgemein Präventive Medizinische Screenings (BGM)
Interimsweise Erbringung von Laborleistungen für das ukb (VB)
Betriebsärztliche Betreuung der Justizvollzugsanstalt Rheinbach
Beratungsleistung
Soziale Betreuung und Präsenzdienst im NachtRaum in Mainz im Zeitraum 01.12.2026 - 01.12.2028
Diagnostisches Verfahren, MRT-Studie
Metallbau Stahl-Elemente Türen Windfang (21740102 / JVA FL / Sanierung des Haftbereichs)
Entsorgung von Textilien
RV Digital Signature Monitore
BFI Freianlagenplanung für die Elektrifizierung der Abstellfläche und den Neubau einer Einsatzleitung auf dem Busbetriebshof Indira-Gandhi-Straße
VE 1 - Kabeltiefbau und Kabelverlegung LST und TK inkl Anpassungsarbeiten Strecke 5510/5555/5710
Baumeisterarbeiten u. Rigole / Grundleitungen
© 2026 SIA «Vietne». All rights reserved.