The Hokitika swimming pool currently has a diesel boiler heating the pool water temperature, and electrical heaters for space heaters. We are looking to replace the diesel boiler to lower operational costs from the diesel boiler, and improve the space heating to provide a better environment within the swimming pool concourse • Electrical main board upgrade and power supply to new heating systems • Design & build new platform and enclosure, with acoustic screening and access. Strengthening of existing plantroom enclosure • Supply and install new AHU and heat pump and connect into existing plantroom
Published
06.05.2026
Awarded
06.05.2026
Livingstone Street Stormwater Renewal
Closed·Jul 23
18-19-08 Arahura Water Treatment Plant
Awarded·Apr 17
South Westland Solid Waste and Recycling Services
Awarded·Mar 26
Ross Swimming Pool Renovation 25-26-06
Awarded·Mar 26
Haast Watermains Upgrade
Awarded·Nov 27
WCWT New Totara River Bridge RFP
Awarded·Nov 27
Lake Terrace Water Treatment Plant Seismic Strengthening
Open for bids·Oct 25
Wastewater Network Pipe Rehabilitation 2627
Open for bids·Oct 23
Advance Notice - Coronial Support Services Procurement
Open for bids·Oct 23
UCOL Block 1 West & Block 3 Seismic Strengthening Project
Open for bids·Oct 23
Contract 26/77 - Railway Drain Stormwater Treatment - Request for Tender – Advertising Notice
Open for bids·Oct 23
14622 - Brigham Creek Roundabout Improvements Detailed Design (RFT)
Open for bids·Oct 23
Create an account to explore this tender and find similar opportunities.