Loading Otnox...
Otnox
UKUnited Kingdom·Buyer: METROPOLITAN POLICE SERVICE

Hillingdon PS HQ - M&E Works

Awarded·28 Aug 2026·GBP 710,528

The works comprise of two works packages: replacement of the boiler plant and replacement of the mains LV switchboard. The boiler works are to strip out the existing boilers, flues, pipework and redundant oil tank and replace with four new gas boilers complete with new gas and LTHW pipework, a plate heat exchanger, pressurisation units, air and dirt separators flues, and a temporary boiler to maintain heating during the works, along with all associated electrical, controls/BMS, and builders work. The switchboard works are to remove the existing mains LV switchboard, installing a temporary panel board to keep the building powered and subsequently replace with a new mains LV switchboard, re-terminating and partially replacing the existing submains, and testing/commissioning the full installation in coordination with UKPN including surveys and validations

Deadline

27.07.2026

Published

28.08.2026

Awarded

28.08.2026

© 2026 SIA «Vietne». All rights reserved.