The contract is for the redevelopment of the existing playground at Great Billing Pocket Park, including the removal of outdated playground equipment, associated groundwork, supply and installation of new play equipment (multiple swings, fort style climbing frame with slide, trapeze swing, scramble net, springy), benches, safety surfacing and completion of post-installation inspection and certification.
Deadline
05.01.2026
Published
08.04.2026
Awarded
08.04.2026
Childrens Playtower
Longcroft Close Play Area - AWARD
RMBC - ZC - Playground, Trim Trail, Sensory, Gym, Basketball 2026 (direct award ITT) - AWARD
PRTC
BHCC JB Stanmer Park Accesible Destination Play Area - AWARD
BHCC JB The Level Play Area - AWARD
© 2026 SIA «Vietne». All rights reserved.