The Services include the design engineering / supply / FAT / delivery / unloading on foundation and commissioning of “Emergency Power Systems” 20kVA and 50kVA including all accessories to substations as well as any related services to TSO’s Onshore and/or Offshore substations as described in the contractual documents. Estimated quantities for the framework agreement term across all types of emergency power systems are for lot 1 26 units/containers (maximum 52 units) and for lot 2 18 units/containers (maximum 36 units). However, there is no volume commitment. Further information can be obtained from the tender documents.
Published
13.07.2026
Awarded
13.07.2026
Netzverstärkung Mecklar - Vieselbach Montage-/Demontageleistungen zur Umbeseilung der 380-kV-Leitung Mecklar – Vieselbach 449/450/454
Active
Preliminary Market Consultation – Compact SOV / Walk-to-Work offshore logistics and accommodation concept for the operation and maintenance (O&M) of the ONAS offshore substation platforms in the German Baltic Sea
Active
Kabelschutzrohre NordOstLink
Active
Vermittlung von Beratungsleistungen On- und Offshore
Active
Market Consultation - Questionnaire on the Further Development of HVDC Multiterminal Systems towards Multi-Vendor
Active
Elektrotechnische Leistungen in 220-/380-kV-Umspannwerken / Electrotechnical Works in 220-/380-kV Substations
Active
© 2026 SIA «Vietne». All rights reserved.