*Marine construction services
Published
11.09.2026
Open for bids
11.09.2026
Deadline
21.09.2026
Analysis of the Beluga Fattening Cycle using photogrammetry
Active
3 Propane Engine Forklifts - Hatcheries
Active
Imaging of Southern Nova Scotia coastline using ShoreZone methodologies
Active
Wharf Repairs, Port au Choix, Newfoundland and Labrador
Active
RFSO -Coastal imaging, habitat classification, shoreline assessment in Canada
Active
Float Replacement - Gimli, MB
Active
Wharf Repairs, Port au Choix, Newfoundland and Labrador
Active
F521A-250010 - Phase 1 - Oona River Dredging
Active
Float Replacement - Gimli, MB
Active
Structure 401 Timber Pile Repairs - Head Harbour, Campobello Island, NB
Active
Maintenance dredging with floating equipment at Baie-Comeau, QC
Active
Wood Islands Containment Cell, Wood Islands, PEI
Active
© 2026 SIA «Vietne». All rights reserved.