A Marine consultant is required for Preliminary (Feasibility), Design and Contract Documents (Stages 1, 2 and 3) for a pontoon structure alongside the Abbey Pier on Sherkin Island. Concept and planning designs need to be developed followed by the submission of a Marine Area Consent (MAC) and Part 8 planning application.
Published
02.09.2026
Open for bids
02.09.2026
Deadline
29.09.2026
Establishment of a Multi-Party Framework Agreement for the Provision of Archaeology Services for Housing Building Projects for Cork County Council
Topographic, Hydrographic and Structural Survey Services for the Cork to Kinsale Greenway Project
Cork Safety Improvement Schemes - Lot A
Cork County Hall Campus - Facilities Maintenance
Panel for the Provision of Ecological Survey Services 2025-2028
Parking Fines Management System
Multiple Operator Framework Agreement for Project Teams for Refurbishment and New Build Facilities for University of Galway Ref. GALW/BUILD/1731/2024
Establishment of Framework Agreement for Architectural and Engineering Related Services
Provision of a Senior Integration Development Resource for the Student Information System Project
FCL033F Single Supplier Framework Agreement for the supply of Cleaning, Paper, Personal Hygiene and Period Equality Products
Consultancy Services (Integrated Design Team) Enabling the Potential of Ballaghaderreen Plots
CFT 4006 - Digital Collections System for SDCC Libraries
THE EXECUTION OF A PROGRAMME OF REPAIRS TO EXISTING FIRE DOORS AND THE CARRYING OUT OF ANNUAL INSPECTION / MAINTENANCE VISITS
Single-Party Framework Agreement for The Supply of Promotional Branded Merchandise for Beaumont Hospital
© 2026 SIA «Vietne». All rights reserved.