The Institute is currently confronted with serious infrastructure constraints, including inadequate offices for staff, limited classroom and conference facilities, and poor drainage systems at its present location. This is despite having access to a large expanse of underutilized land within the premises.
Published
13.11.2025
Open
13.11.2025
Deadline
04.12.2025
Household Equipment
Active
Materials and Consumables
Active
Contruction of Elevator Shaft
Active
Perimeter Fencing to lawns at frontage of school and Ceremonial Dais Fabrication Works and other Ancillary Works
Active
Perimeter Fencing to lawns at frontage of school and Ceremonial Dais Fabrication Works and other Ancillary Works
Active
Household Equipment
Active
© 2026 SIA «Vietne». All rights reserved.