Resurfacing of the footway and areas of the carriageway, and relaying of kerbs and tactile paving to alter levels for improved drainage. In the case of Nags Head Hill, there is also an introduction of a channel in the footway, and a temporary relocation of the existing traffic signals will be required. In the case of Air Balloon Road, there is the introduction of two new gulleys, a new manhole, and a new catchpit to tie into existing drainage. Direct award via Lot 5 Highways Civil Engineering works up to £499,999 (excluding VAT) of BCC's Highways Asset Management and Civils Framework
Deadline
29.05.2026
Published
28.08.2026
Awarded
28.08.2026
E24057 East Street and Cannon Street Signal Refurbishment
Active
E25023 Netham Lock Traffic Signals Refurbishment
Active
Provision of ICT maintenance and support services for Bristol City Council (2026-2027)
Active
Provision of ICT maintenance and support services for Bristol City Council (2026-2027)
Active
Architectural Services - MEND5 BMAG Refurbishment
Active
Provision of ICT maintenance and support services for Bristol City Council (2026-2027)
Active
© 2026 SIA «Vietne». All rights reserved.