Replacement of water drainage systems (pumps specifically). Components of work include; design, fabricate, and install new pipework, pumps providing all equipment and installations. Testing to be completed with the contractor responsible for the power supply to the existing systems.
Deadline
12.01.2026
Published
11.03.2026
Awarded
11.03.2026
Household Waste Recycling Centre Drainage Improvement Works
Ovington Court
M6 Lune Gorge - Drainage Surveys
GB-Camberley: Camberley Theatre Drainage Remedial Works
ENQ1347 - Ice Rink for Festive Derby
Internal Audit Plan 25-26
Passenger Lift Replacement Within Diplomatic Mission
Pakistan NDC 3.0 Delivery Coordination Mechanism (Federal-Provincial Coordination and Tracking)
GB-Sheffield: Legal services Project Espresso
Tactical End User Compute service
© 2026 SIA «Vietne». All rights reserved.