The Tower Block Dirty Utility Conversion works at Gloucestershire Royal Hospital comprise the conversion of existing dirty utility rooms into bin stores as part of remedial measures to improve fire safety. The scope of works includes isolating and draining down the hot and cold-water services; removing redundant pipework, fittings and waste connections serving the sluice sink; stripping out the existing worktop and wall-mounted fixtures; isolating and removing socket fronts to facilitate the installation of floor-to-ceiling white rock wall cladding with jointing strips; reinstating socket fronts upon completion; providing Chapter 8 barriers to the lift lobby and ward access areas; checking that riser cupboard door locks and slip bolts are operational; and providing a banksman as required.
Deadline
14.08.2026
Published
08.09.2026
Awarded
08.09.2026
Kitchen & Bathroom Replacements
Consultancy re. Replacement of Roof and Solar Panels at Cranleigh Health Centre
Timber Crib Wall Repair
PAHT - UTC Fire Escape Extension
Domestic Energy Retrofit Works
Kitchen & Bathroom Replacements
25-294: BATCH 18
Taxi and MPV (1-8 seats) Passenger Assistant - Taxi and MPV (1-8 seats) Passenger Assistant
St Thomas' Hospital Energy Project - Contract Mobilisation and Project Management Support
Uniform, Inventory and Asset Management Solution
BCP Solution Implementation Services
Business Analyst Service
© 2026 SIA «Vietne». All rights reserved.