The Food and Drugs Authority (FDA) intends to apply part of its budgetary allocation to fund eligible payments under the contract for the Design, Supply and Installation of a 1600AMPS and 250AMPS Automatic Transfer Switch with Smart Controller for 500KVA Generator Set at the FDA Head Office, Shiashe.
Published
02.05.2025
Open
02.05.2025
Deadline
02.05.2025
© 2026 SIA «Vietne». All rights reserved.