Published
16.07.2026
Open for bids
16.07.2026
Deadline
10.08.2026
Maintenance of Eastern Main canal along with construction of HRCR at S2, Canal Lining at S3,Causeway, catch drain at Bhuwarbhawani Temple, VRB's at main Canal, etc.
Active
Command Area Protection Work at Bandaraiya Naala
Active
Protection of Sikta Village from Backwater Flow of the West Rapti River Caused by Ponding at Sikta Barrage during Canal operation
Active
Rehabilitation and Maintenance of the Phattepur Branch Canal up to Ch. 4+200, including the Rehabilitation of S1, S2, and S3 Sub-Branch Canals
Active
Rehabilitation of Protection Work at Sinabaaj
Active
Construction of Parsenipur Sub-Secondary Canal (S4SS4), Direct Outlet (S4DOL), Tertiary Canal and Associated Structures
Active
© 2026 SIA «Vietne». All rights reserved.