Published
20.11.2025
Open
20.11.2025
Deadline
20.11.2025
Construction of 1NO. Standard Football Pitch at Agona Nkwanta
Active
Rehabilitation of 1No. steel bridge at Busua
Active
Construction of a Proposed Cassava Processing Factory at Apeminim
Active
Construction of 1No. 3-unit Classroom Block with Ancillary Facility (3-Seater WC. Changing room, 1 Borehole, Polytank and 4.4m Concrete Polytank Stand) at Egyambra
Active
Construction of 18No. Mechanized borehole with Concrete Overhead Polytank Stand and 10,000 Litres Water Storage Tank and Extension to 3 fetching point
Active
Construction of 1No. CHPS Compound with Ancillary Facilities at Ankyeryin
Active
© 2026 SIA «Vietne». All rights reserved.