Construct 8 Community Level demand driven Irrigation schemes and support structure totalling 200Ha
Published
21.08.2026
Open for bids
21.08.2026
Deadline
21.09.2026
CONSTRUCTION OF TWENTY-FIVE (25NO.) SOLAR POWERED WATER RETICULATION SYSTEMS IN GWEMBE CLUSTER (SOUTHERN PROVINCE) UNDER THE PIDACC – ZAMBEZI BASIN.
Active
CONSTRUCTION OF TWENTY-TWO (22No.) SOLAR POWERED WATER RETICULATION SYSTEMS IN KALENE CLUSTER (NORTHWESTERN PROVINCE) UNDER THE PIDACC – ZAMBEZI BASIN
Active
TENDER FOR THE PROPOSED CONSTRUCTION OF THE NEW FOOD AND AGRICULTURE ORGANISATION (FAO) OFFICE PREMISES IN LINE WITH THE HOST COUNTRY AGREEMENT BETWEEN THE REPUBLIC OF ZAMBIA AND FAO.
Active
Supply and Delivery of: 403 Metric Ton Urea
Active
Supply and Delivery of: 805 Metric Ton Sulphate Of Ammonia
Active
Supply and Delivery of: 371 Metric Ton Muriate Of Potash
Active
© 2026 SIA «Vietne». All rights reserved.