Brewery Turnback an enhancement scheme funded by the DfT. Formerly known as Manchester Victoria East Turnback, it has been prioritised for early development from the Central Manchester Capacity and Performance study to boost capacity and resilience. The scheme is for the design and delivery of a West facing turnback, located at Brewery Junction. At Victoria station, the through platforms also accommodate terminating trains due to an imbalance of local services to the east and west of the station. The extended time to terminate and turnback in the platforms restricts platform availability for through services. Operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during times of perturbation. The turnback is to accommodate trains up to 6 car x 26 m vehicles (DMU and EMU); with trains being able to access the turnback to and from Platforms 3-6 at Manchester Victoria station. As part of the MNTP programme, it was identified that the provision of a turnback facility to the East of Manchester Victoria Train station would provide operational flexibility. Currently, the platforms at Manchester Victoria must accommodate terminating trains, this restricts the availability of the through platforms, impacting performance and causing a timetable constraint. In a standard hour, two services, typically from Kirkby / Preston / Wigan are booked to terminate in the through platforms before the driver changes ends and the train departs in the opposite direction. Typical turnaround times are between 5-10 minutes, meaning that the platform, and route through it, remains occupied for the duration of the turnaround. The operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during perturbation. ES2-4 design and development was undertaken by WSP Limited and accepted by Network Rail. However, there are many instances within the designs where assumptions have been made stating that the TRU works would be complete prior to commencement of the project and all as built designs and source records would be available. Permanent Way Scope of Work: The supply, installation, testing and commissioning of the new turnback facility to accommodate trains: 1. provision for a 6-car and buffer stop siding facility 2. passive provision for an 8-car and buffer stop turnback facility 3. track drainage This includes all hand back deliverables, such as redline drawings, O&M manuals, and attendance at AMP016 walkouts.
Published
07.10.2025
Open for bids
07.10.2025
Deadline
13.10.2025
Oldfield Road - E & P Works
Closed·Oct 22
Oldfield Road - Telecoms
Closed·Oct 22
Brewery Turnback - ES6-8 Devegetation Works
Closed·Oct 7
Brewery Turnback - ES6-8 E & P Works
Closed·Oct 7
Brewery Turnback - ES6-8 OLE Civilis / Foundations Works
Closed·Oct 7
Brewery Turnback - ES6-8 OLE Infrastructure
Closed·Oct 7
Manchester International Airport - OLE Phase 3 Works
Closed·Sep 30
Manchester International Airport - Demolition Works
Closed·Aug 27
Brewery Turnback - ES6-8 OLE Civilis / Foundations Works
Closed·Oct 7
DDaT26396 - Software Subscription
Awarded·Oct 14
Digital Blue Print Fast Track Validation
Awarded·Oct 14
CA18415 - RFQ2026/33 - NMANDD PEACEPLUS Thriving Together PEACEPLUS 3.2 Creative Cultures After school
Awarded·Oct 14
WSCC Route 10011 - Ifield & Crawley to Meath School - 4 Seats, 2 Passengers
Awarded·Oct 14
715865522 - Voyager Legal Support Contract (CCS RM6360) LOT 2 AWARD
Awarded·Oct 14
Forensic Case Management System
Awarded·Oct 14
Create an account to explore this tender and find similar opportunities.