Loading Otnox...
Otnox
NZNew Zealand·Buyer: Health New Zealand (Te Whatu Ora)

Boiler House Energy Centre Electrical Upgrade Project (Substation 3)

Open for bids·5 Oct 2026

Health NZ is undertaking a project to implement new electrical distribution and control systems at substation 3 (Block T / “Boilerhouse”) at Palmerston North Hospital. We require the services of a Main Contractor to construct and commission the substation 3 electrical infrastructure works whch include: - Installation of new structural elements, building structures and fire separations. - Provision of new LV MSB (MSB 3) and LV generator bus A and B switchboards as indicated on drawings. - Removal of redundant equipment as indicated on drawings. - Installation and connection of new supply transformers 7455-P and 7456-P - Provision of temporary supplies and controls as required to undertake the project - Removal of redundant transformers and refurbishment of transformer bays as specified - Termination of new LV mains and submain cables - Submain migrations - Mechanical systems - Controls systems isolations and new equipment as indicated on drawings. - Software and HMI programming. - Controls and communications integration - Site based Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) (Offload). - Project Completion Blackstart test (TBC). - Making good and passive fire protection as specified.

Published

05.10.2026

Open for bids

05.10.2026

Deadline

16.11.2026

Otnox

Find tenders worth bidding for.

Create an account to explore this tender and find similar opportunities.

  • Tender documentsReview available files in one workspace.
  • Requirements and risksRequest a document analysis with references to the sources.
  • Your tender selectionContinue with your selected markets and sectors.