High level summary of the project includes: Undertaken roof repair as there are leaks throughout. Installation of roof insulation and suspended ceiling. Upgrade of all glazing and doors (including fire doors). Strip out of existing M&E services/plant. Installation of VRV/VRF system and ASHP. Upgrade of all lighting and ensuring complete electrical installation is ATEX/DSEAR compliant. Note, a Stage 3 design and report will be provided and we would expect a stage 4 design/report before we progress with the build stage.
Published
18.08.2026
Open for bids
18.08.2026
Deadline
15.09.2026
CA17043 - Phase 4 Public Sector Decarbonisation Scheme
CA18338 - Chesterfield College Training & Production kitchen ducting, heating and control panel
Badsley Primary Heating and Electrical Works
MDDC202504-001 -ASHP 2 ASHP upgrades 2025/26 - 2027/28
Luton Council FTS Open Tender Framework procurement for Mechanical Services Support: Domestic Gas Servicing and Associated Work, Domestic Boiler Replacement and Associated Work, Communal Boiler Servicing; Maintenance and Mechanical, Water Treatment Services and Associated Works.
25-294: BATCH 18
Taxi and MPV (1-8 seats) Passenger Assistant - Taxi and MPV (1-8 seats) Passenger Assistant
St Thomas' Hospital Energy Project - Contract Mobilisation and Project Management Support
Uniform, Inventory and Asset Management Solution
BCP Solution Implementation Services
Business Analyst Service
© 2026 SIA «Vietne». All rights reserved.