The works comprise a pre-construction contract for the Little Bispham to Bispham & Gynn Square to Cocker Square Coast Protection Scheme (sections B1.2 & B1.4 of the Blackpool coastal frontage, respectively). The project comprises a series of Rock Headlands, with associated cross over access ramps, that are designed to stabilise or reverse the long-term beach lowering trend at the toe of the existing defences. The works also include urgent repairs to the existing coastal defences (e.g. recasting/patch repairs to selected areas such as where there is exposed reinforcement or significant cracking). This will include recasting beach access steps where required for public safety and major improvements to the slipway at Little Bispham. The extent and details of the urgent revetment repairs, recasting access steps and slipway improvements will be developed and fully defined during the detailed design phase.
Deadline
01.02.2026
Published
07.04.2026
Awarded
07.04.2026
Provision of Occupational Physiotherapist
Active
Provision of Specialist Printing Services for Annual Council Tax Bills, Annual Business Rates Bills, Annual Housing Benefit and Annual Council Tax Reduction Scheme Letters, plus Daily Council Tax and Business Rates Documents, including Council Tax Reduction letters YPO, CCS, ESPO Framework RM6280 - (Postal services and solutions)
Active
Prepaid Card Accounts
Active
Provision of Office Furniture - Further competition under the YPO Framework Office Furniture Solutions and Associated Services Ref No: 1281
Active
© 2026 SIA «Vietne». All rights reserved.