Published
11.09.2026
Open for bids
11.09.2026
Deadline
12.10.2026
Office furniture for KSC
Total Maintenance for Critical Facilities at USAG Humphreys and Camp Yongin
USFK Installation Survey Equipment
LIFECYCLE REPLACEMENT (LCR) OF AC UPS SYSTEM IN THE CP TANGO
Repair Outdoor Switchgear Cabinets, Beacon Hill, S-1459 at USAG Humphreys
Barracks CCTV Purchase/New Installation / Replacement on Camp Bonifas, Carroll, Henry, Humphreys, Walker, Yongin and Osan AB (103 Barracks)
MAJOR M&R MONTAUK SPRINGS HOUSING, AT USCG SECTOR LONG ISLAND SOUND, EAST HAMPTON, NY 11937
Sector San Diego- UPH - 05 Bathrooms Renovation
Sector San Diego- UPH - 05 Bathrooms Renovation
FY27 AFHC Renovate Tower B743 CZ, Camp Zama, Kanagawa, Japan
Z--Rehab Limantour Residence 160, Point Reyes N.S.
CMR Lift Interior renovation
© 2026 SIA «Vietne». All rights reserved.