Published
11.06.2026
Open
11.06.2026
Deadline
09.07.2026
Replacement of Asbestos Bulk Line from Water Treatment Plant to Bloedfontein Reservoir Phase 4
Active
Construction of Katjibane Bus and Taxi Route Phase-5
Active
Construction of Mmametlake Bus and Taxi Route Phase 4
Active
Electrification of 138 Household in Phake Phase 2B
Active
Electrification of 100 Household in Madubaduba Phase 1
Active
Construction of Loding Bus and Taxi Route
Active
© 2026 SIA «Vietne». All rights reserved.