Replacement of AHUs and BlueBox which have reached the end of their service life. This requirement was awarded through the NHSSBS framework Hard Facilities Management 2 (Hard FM), Lot 5.1: Ventilation and Air Conditioning,
Deadline
16.10.2025
Published
11.08.2026
Awarded
11.08.2026
© 2026 SIA «Vietne». All rights reserved.