Project Background: To maximize the irrigation potential of the land in the Brooks and Bow Island areas, we need to reorganize the placement of the linear pivots as well as demo old and repair irrigation line. Relocating the two linear pivots to the Brooks area would significantly increase the irrigated acreage, effectively doubling the irrigation capacity across the three locations. Access to irrigated land for agricultural research in Southern Alberta has been a high priority for researchers working with the County of Newell. Moving the linear pivots from the Bow Island property will also provide an opportunity to optimize the irrigation layout at that location. Improving the irrigation efficiency at all farm sites will make the land more attractive to lease and provide leaseholders with greater flexibility to irrigate as needed. Project Objectives: The project will be broken down into 2 distinct phases. We would like to have a single contractor responsible for managing all aspects of this project. Phase one of this project will include separating and moving two, seven tower linear pivots from SE 17-9-11-W4 (County of Forty Mile) to three separate field locations in the County of Newell near Brooks, AB. The two linear pivots will need to be separated and re-setup in 6 different fields with 5 fields requiring 2 towers and 1 field requiring a 3-tower set up. Once set up, each new installation will require a generator to operate it, a new panel, and a guidance system to direct it. The successful proposal will ensure to the best of their abilities which system set up will best match each field. Once the site at SE 17-9-11-W4 is cleared of the linear pivot spans, the second phase will be to remove the existing mainline and electric service (approximately 700 m), remove and install a new mainline (approximately 350 m), new power from the pumphouse to the new pivot pad (approximately 350 m), new electrical panels and VFD, and new low pressure centre pivot. The design of the pivot and sprinkler package should be for no less than 1000 GPM. The centre pivot will be required to have GPS guidance and be set up to be operated remotely. It is anticipated that this will be a turnkey operation that maximizes the acres that the LPCP can cover. All work to be completed after harvest (2026) and before seeding (2027). Project Structure/Business Model: This project needs to be managed and maintained by the contractor awarded the bid. Changes and updates need to be communicated to the Contracting Manager and the CDC Project Coordinator. The project may need to have phase 1 and phase 2 happening concurrently. The winning proposal should outline clearly how they will ensure the timely completion of this project so that all areas will be able to be irrigated at the starting of the field season in 2027. Key Stakeholders: The key stakeholders of this project are listed below: • Contractor • County of Newell • County of Forty Mile • Ministry of Infrastructure • Eastern Irrigation District • St. Mary’s Irrigation District • GOA on-site staff • Field Lease Holders Related Project Documents: All documents will be available upon request during the suggested walk through to all interested parties creating a proposal to this RFP. We have access to original drawings for all sites as available. Miscellaneous: Walk through of the removal of the linear pivots at SE 17-9-11-W4 will be available between 9 am and 2 pm on October 13, 2026. Please create the site visit time by contacting the Contracting Manager before October 12th, 2026.
Published
02.10.2026
Open for bids
02.10.2026
Deadline
06.11.2026
Agriculture and Irrigation - Request for Quotes - Laboratory Particle Size Analyzer
Open for bids·Nov 2
Agriculture and Irrigation - Request for Proposal - Walk In Growth Chamber – JH Helm Building Lacombe
Open for bids·Oct 28
Agriculture and Irrigation - Request for Proposal - Oldman River Dam - Evaluation of Data Anomalies Between Regular Slope Inclinometers and ORICA (Measurand) SAA Monitoring Systems
Open for bids·Oct 28
Agriculture and Irrigation - Request for Proposal - Carolside Dam – Underwater Inspection and Condition Assessment of the Low-Level Outlet Conduit
Open for bids·Oct 27
Agriculture and Irrigation - Request for Proposal - Consultant Services for Program Area Infrastructure and Capital Equipment Condition Assessment
Open for bids·Oct 26
Agriculture and Irrigation - Request for Quotes - Emulsifier
Closed·Oct 23
City of Medicine Hat - Negotiated Request for Proposal - CMH26-122 - UDS Substation Modernization -Supply of Medium Voltage 15 kV Switchgear & Circuit Breakers
Open for bids·Nov 3
Transportation and Economic Corridors - Request for Proposal - CON0026084 - 1:18 Safety Rest Area Situated within km 48.000 to 54.500
Open for bids·Nov 3
Forestry and Parks - Request for Quotes - Tandem Axle Enclosed Utility Trailer
Open for bids·Nov 3
Infrastructure - Request for Quotes - Commercial Dishwasher
Open for bids·Nov 3
Request for Standing Offers for Trade Services for Facilities Management
Open for bids·Nov 3
Two Air charter to Kugluktuk from Iqaluit, NU Roundtrip
Open for bids·Nov 3
Create an account to explore this tender and find similar opportunities.