Development, production and delivery of specialised electronic software and few hardware for the control, data acquisition and monitoring of the accelerators. All these components need full software integration into the FAIR accelerator control system. Further, the services include upgrade of already existing operational systems. The services are expected to be delivered within a period of 24 months. For the construction of the first facility section of FAIR, special hardware and electronic components are required on the one hand, as well as support services for software integration into the accelerator's control system and beam diagnostic system. The hardware and software integration serves to ensure compatibility with the very complex and specific control system standards of the FAIR accelerator and is a main component of the scope of delivery. This includes the extension or development of so-called FESA classes with integrated LSA data supply by the accelerator control system as well as the connection to the campus-wide timing system based on a white-rabbit real-time network. In this context, special electronic and mechanical components are to be supplied, as well as programming and support services
Published
14.07.2026
Awarded
14.07.2026
LITE TLD Reader
Awarded·Oct 14
Hand-Foot-Clothing-Monitors FAIR BSA
Open for bids·Oct 8
CPS and UPS systems for SFRS and NUSTAR
Open for bids·Sep 29
Design, Manufacture, Supply and Installation of the Liquid Nitrogen (LN2) Transfer Line System for the Super-FRS Experiment Area
Open for bids·Sep 29
High Speed Detonators
Awarded·Sep 23
Development and Series Production of Current-to-Frequency Converters for SIS100
Closed·Sep 16
SCADA Hard- and Software Ukraine
Open for bids·Oct 17
Neuerrichtung eines klimaneutralen Verwaltungsgebäudes; Gebäudeautomation
Awarded·Sep 29
Rahmenvereinbarung Lieferung und Montage Medientechnik
Closed·Aug 26
Sleepertrasse
Awarded·Aug 18
Bundesstadt Bonn: La Redoute - Erneuerung der MSR nach Angebot. Aufgrund der Kompatibilität kann die Durchführung der Arbeit nur durch den Hersteller erfolgen.
Awarded·Jul 19
Sleepertrasse
Cancelled·Jul 1
Ersatzbauwerk Rader Hochbrücke inkl. Erweiterung A 7
Awarded·Oct 18
Verwertung / Vermarktung von Eisenschrott
Awarded·Oct 18
Starkstromanlagen (KG 440)
Awarded·Oct 18
ÖFS Brutvogelkartierung 2027
Awarded·Oct 18
Hilfestellung zu Konformitätsbewertung für KI-Innovationen (KI-Reallabore)
Awarded·Oct 18
REZ SW 45ind AA Hanau
Awarded·Oct 18
Create an account to explore this tender and find similar opportunities.