Published
18.09.2026
Open for bids
18.09.2026
Deadline
24.09.2026
FY26-HIG-922 Joanna Briggs Institute Subscription (VA-26-00059034) | Hoffman/Schoenecker | Base POP 9/24/26 - 9/23/26
Proj #TBD | Elevator Modernization | Elias/Prather
Martinsburg, WV Warehouse IOTA
646-24-100 | Elevator Upgrade Bed Tower | Pittsburgh - UD
Burlington, VT and Cheshire County IOT&A
FY26-HIG-922 Joanna Briggs Institute Subscription (VA-26-00059034) | Hoffman/Schoenecker | Base POP 9/24/26 - 9/23/26
MCB Camp Pendleton, CA Industrialized Construction Projects for Barracks via Other Transaction Authority (10 USC 2808a)
PMEL Freezer Farm Renovation Project
Prequalification of Sources for Construction Services to include Design-Build (DB) and Design Bid-Build (DBB) for the U.S. Army Corps of Engineers (USACE) Honolulu District, Area of Responsibility (AOR), Primarily on Kwajalein Atoll, Republic of the Marsh
Design-Build (DB) Barracks Initiative (Package #2), Marine Corps Base (MCB) Camp Lejeune, North Carolina
B268 Replace STUS Backup Generator
Z--DENA 332037 Eielson Roof Replacement
MSANG CRTC 125kW Generator and ATS
Ropes and Container
PRINTED CIRCUIT BOA, IN REPAIR/MODIFICATION OF
Teledyne ACMS Software Subscription C-40 Aircraft
USDA-GIFVL Forklift Repair for Chapman Research Farm in Chapman, Maine
USAFA Ophthalmology Screening Rooms
© 2026 SIA «Vietne». All rights reserved.