The Client wishes to award a Works Order through the Civil Engineering Contractors Framework 2021 (CECF2021) agreement under Lot 1 for 1610 Scot Beck, 1517 Kirk Gill & 1358 Hole House Bridge Maintenance. The selection procedure being followed is the Further Competition procedure. Works required include temporary arch support, removal & disposal of existing fill, take down and rebuilding with lime mortar of parapets and spandrel walls, installation of drainage, temporary spandrel support, saddling and carriageway reinstatement.
Deadline
20.02.2026
Published
07.05.2026
Awarded
07.05.2026
Adobe CCS Aggregation
Active
846-NYC-HA Staff Flu Vaccinations
Active
Roofing Repairs Lot 1A Northand Lot 2A South
Active
Roofing Replacements Lot 1B North and Lot 2B South
Active
Burley Bank Bridge - Replacement
Active
Further Competition - Yorbuild3 Medium works -Lot 1 - Harrogate Convention Centre - Studio 2 Refurbishment
Active
© 2026 SIA «Vietne». All rights reserved.