IVAR's sorting facility with separate lines for sorting of residual waste and sorting of paper burned down in the summer of 2022. The plant will now be re-established. The residual waste sorting facility will be re-established as a MRF plant located in the same building as before. The paper sorting facility will be established at a new location (not yet finally selected). A joint contract will include both the sorting facility for residual waste and for paper. Residual waste sorting plant: A contract shall be entered into for the electromechanical turn-key delivery of sorting facilities for mixed residual waste from households. Capacity: 40 tons/hour The facility will sort out the following fractions: - Mixed plastic - Magnetic Metal - Non-magnetic metal - Tetra - Possible options: o Other options may be included Paper sorting plant Electromechanical turn-key delivery sorting plant for cardboard, paper, beverage carton The facility will sort on the following fractions: - cardboard/cardboard - Reading material/newspapers/magazines - Drinking carton - Mixed cardboard/paper/carton
© 2026 SIA «Vietne». All rights reserved.