To construct the main works, the (Ferrovial BAM JV) Track Systems Contractor (FBRS) will develop and operate various compounds (including railheads) along the route, to meet the construction logistics requirements of FBRS and also support the requirements of other Railway System Contractors from the Alliance. These compounds will require temporary works that will not form part of the final permanent works. The number and location of the compounds to be used are still to be confirmed at this stage: The Consultant shall achieve integration and coordination between temporary and permanent works design, liaising with the Permanent Works Designer where required. Examples of the scope of this required design works are as follows (but not limited to) within compounds and railheads- •Temporary site buildings and offices •Temporary utilities & services •Temporary roadways and hardstandings •Temporary site drainage systems •Fencing •Lighting & Security systems Note: the scope does not include any design of Track layouts and geometry, Track, Track drainage, LWR and S&C hardstanding areas, associated gantry foundations within the railheads. Potential mobilization start (soft start) in October 2026 - then estimated full start February 2027.
Veröffentlicht
01.05.2026
Offen für Angebote
01.05.2026
Frist
15.05.2026
Specialist Rail Systems Personnel
Offen für Angebote·Oct 28
Transport of slabs
Offen für Angebote·Oct 21
LWR Trailer Solution
Geschlossen·Aug 18
Temporary Works Designer (Track Design Railhead)
Geschlossen·May 1
Temporary Works Designer - Framework
Geschlossen·May 1
Temporary Works Designer (Track Design Railhead)
Geschlossen·May 1
Specialist Rail Systems Personnel
Offen für Angebote·Oct 28
NE - CDF - Lot 1 - River Hipper FAS SOC to OBC Appraisal
Zuschlag erteilt·Oct 27
EAN - AOMR - Lot 1 - Snettisham Hard Defence Repairs
Zuschlag erteilt·Oct 27
Contract Award Notice - Tree Inspections & Tree Works for Upper Thames 26-27 - Lot 3
Zuschlag erteilt·Oct 26
Temporary Agency Staff for Drainage Engineer
Zuschlag erteilt·Oct 20
Technical Approval Authority - Advisor
Zuschlag erteilt·Sep 29
2026-10-28 09:00 - QSB467 Ipswich to Pushforward Secondary (various locations in Ipswich, Stowmarket & Bury St Edmunds) - AWARD
Zuschlag erteilt·Oct 31
March 2027 Bus Contracts
Zuschlag erteilt·Oct 31
Infrastructure Connection Design Support - Pathology Lab
Zuschlag erteilt·Oct 30
Provision of Pre-Paid Cards
Zuschlag erteilt·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Zuschlag erteilt·Oct 30
Business Travel Services
Zuschlag erteilt·Oct 30
Erstellen Sie ein Konto, um diese Ausschreibung zu prüfen und ähnliche Möglichkeiten zu finden.