To construct the main works, the (Ferrovial BAM JV) Track Systems Contractor (FBRS) will develop and operate various compounds (including railheads) along the route, to meet the construction logistics requirements of FBRS and also support the requirements of other Railway System Contractors from the Alliance. These compounds will require temporary works that will not form part of the final permanent works. The number and location of the compounds to be used are still to be confirmed at this stage: The Consultant shall achieve integration and coordination between temporary and permanent works design, liaising with the Permanent Works Designer where required. Examples of the scope of this required design works are as follows (but not limited to) within compounds and railheads- •Temporary site buildings and offices •Temporary utilities & services •Temporary roadways and hardstandings •Temporary site drainage systems •Fencing •Lighting & Security systems Note: the scope does not include any design of Track layouts and geometry, Track, Track drainage, LWR and S&C hardstanding areas, associated gantry foundations within the railheads. Potential mobilization start (soft start) in October 2026 - then estimated full start February 2027.
Veröffentlicht
01.05.2026
Aktīvs
01.05.2026
Frist
15.05.2026
LWR Trailer Solution
Temporary Works Designer (Track Design Railhead)
Procurement for Designated Roles (PSC) Independent Safety Assessor (ISA) professional service (extended)
Professional Services - Ferrovial-BAM Joint Venture - HS2 Rail Systems
Independent Technical Review - Rail Construction Operating Methodology (Professional Services)
CA18274 - ITT 44/2026 44 - ICT For Newry City to Poyntzpass Greenway Improvements BCC Framework Lot 1
BRE037 - 100ft Desilting 2026-2027
BRE031 - Cradge Bank Repairs 2026-2027
Stanground 2025
STON001 - Stony Stratford Sluice Platform and Stilling Well
Contract Award Notice - Penton Hook Maintenance work Lot 3
Procurement of office and IT equipment
T0345 - Dry Dock & Repair of Lightvessel 06
T0345 - Dry Dock & Repair of Lightfloat 03
T0345 - Dry Dock & Repair of Lightvessel 07
Provision of External Legal Panel Support for Patrick Finucane Inquiry
Face to Face Translation Services Contract
© 2026 SIA «Vietne». Alle Rechte vorbehalten.