The required CPS and UPS modules, as well as the external battery modules, serve as power supply systems. They are installed in 19"-racks. These racks are located along the beamline of the Super-FRS (Superconducting Fragment Separator), either directly at the beamline or in niches. The Super-FRS is part of the FAIR accelerator facility (Facility for Antiproton and Ion Research), which is currently under construction in Darmstadt, Germany. At their operating location, the systems are therefore exposed to increased radiation levels and are difficult to access. Since the components connected to the racks (e.g., detectors and electronics) are sensitive to random power fluctuations and interruptions, the CPS (Clean Power Supply) modules are intended to provide possible interference-free power, while the UPS (Uninterruptable Power Supply) modules, combined with battery units, are used to maintain the power supply in the event of a power failure.
Veröffentlicht
29.09.2026
Offen für Angebote
29.09.2026
Mettler XPR2U microbalance
Offen für Angebote·Oct 29
Supervision Frankreich
Zuschlag erteilt·Oct 29
Rahmenvertrag für Montage- und Transportdienstleistungen zur Installation von SFRS-Komponenten
Offen für Angebote·Oct 27
Compressed Air Components for FAIR
Offen für Angebote·Oct 25
LITE TLD Reader
Zuschlag erteilt·Oct 14
Hand-Foot-Clothing-Monitors FAIR BSA
Offen für Angebote·Oct 8
Lieferung elektrischer Energie (Vollversorgung) für den Zeitraum 01.01.2027 bis 31.12.2029
Offen für Angebote·Oct 23
Kauf und Lieferung von USV-Geräten für den Landkreis Potsdam-Mittelmark
Offen für Angebote·Oct 22
Austausch / Instandsetzung USV- Anlage
Offen für Angebote·Oct 17
Austausch der Batterieanlage der USV-Anlage in der ZAW
Zuschlag erteilt·Oct 1
Oberwellenkompensation VS Wittenburg
Geschlossen·Sep 22
Framework agreement for delivery and service of battery storage projects in Germany for Trianel Energieprojekte GmbH & Co. KG
Geschlossen·Sep 18
Neue Waldorfschule Dresden, Neubau BA 3 Oberstufenhaus - Los 43 - Stark- und Schwachstrom
Offen für Angebote·Oct 29
Monitoring Lausitzer Neiße - Polnische Seite
Zuschlag erteilt·Oct 29
Kauf fabrikneuer Beladung für Feuerwehrfahrzeuge
Offen für Angebote·Oct 29
Rahmenvereinbarung über die Lieferung von KFZ-Ersatzteilen und Verbrauchsmaterial (Kopie)
Offen für Angebote·Oct 29
1885-NA-D-LBO Planning Client
Zuschlag erteilt·Oct 29
Hanau, Am Hauptbahnhof 1, Sanitär- und Heizungsarbeiten
Offen für Angebote·Oct 29
Erstellen Sie ein Konto, um diese Ausschreibung zu prüfen und ähnliche Möglichkeiten zu finden.