Following UK exit from the European Union (EU), the Windsor Framework (incorporating former arrangements under the Northern Ireland Protocol) requires Northern Ireland to continue to adhere to the EU Official Controls set out in Regulation 2017/625, ref regarding the arrangement of official controls, including the designation of NRLs. Furthermore, NRLs for NI must be separately designated from those in GB, whereas prior to EU exit, NRLs were designated on a UK-wide basis. Additionally, under the Windsor Framework arrangements, NI NRLs must be located in an EU member state or within European Economic Area (EEA) i.e. they cannot be located within any part of the United Kingdom, including Northern Ireland..
Frist
01.10.2025
Veröffentlicht
08.01.2026
Awarded
08.01.2026
Holiday Activities and Food (HAF) Programme National Evaluation (Con_32276)
Age-friendly Training
PS26173 - Unlocking Space for Business Delivery Partner
Research project: What more could pre-registration education and training of health and care professionals do to uphold professionalism, encourage positive working cultures and prevent future misconduct?
RSGR0003 - National Rail Travel Survey - Discovery Phase
PS26175 - Evaluation of DSIT Carbon Offsetting Consultancy
Procurement of office and IT equipment
T0345 - Dry Dock & Repair of Lightvessel 06
T0345 - Dry Dock & Repair of Lightfloat 03
T0345 - Dry Dock & Repair of Lightvessel 07
Provision of External Legal Panel Support for Patrick Finucane Inquiry
Face to Face Translation Services Contract
© 2026 SIA «Vietne». Alle Rechte vorbehalten.