Replacement of playground at Swanley Recreation Ground. To create a wetpour base with a new wetpour safety surface which compiles with BSEN 1176 and has a minimum guarantee of 2 years but preferably longer. A maintenance plan is a desirable extra service we would like. The product should have been tested in accordance with BS EN 1177 and BS EN 7188. To remove existing equipment, wetpour and then top soil with seed the current playarea and replace with new equipment in a new location on the Recreation Ground with a significantly uplifted play value compared to the current playground. The area and equipment where possible should follow a space theme. On-site meetings are essential with supporting information provided at that meeting.
Termín
16.01.2026
Zveřejněno
05.02.2026
Awarded
05.02.2026
Play Area Replacement at St Johns Open Space, Newton-le-Willows
Přiděleno·Oct 28
Bespoke Playground for Bouverie Square, Folkestone
Přiděleno·Oct 22
West Bridgford Playground Refurbishment - Toddler and Junior Area - The Hook Lady Bay
Přiděleno·Oct 19
ENQ1326
Přiděleno·Oct 14
Skateboard Park Remodelling
Otevřeno k podání nabídek·Oct 6
Whittle Street Play Area
Přiděleno·Oct 5
Infrastructure Connection Design Support - Pathology Lab
Přiděleno·Oct 30
Provision of Pre-Paid Cards
Přiděleno·Oct 30
7.5t Isuzu Repower (Electrification) 7.5t Isuzu with NTM Polybody Refurbishment
Přiděleno·Oct 30
Business Travel Services
Přiděleno·Oct 30
Call-Off : GLCCA Project, Programme and Portfolio Management Solution
Přiděleno·Oct 30
QLT354 2026-10-29 (0900) Leiston - Roman Hill Primary School, Lowestoft (8 seats and a PA) - AWARD
Přiděleno·Oct 30
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.