Replacement of playground at Elephant Park, otherwise know as Petham Park. To replace current wetpour base with a new wetpour safety surface which compiles with BSEN 1176 and has a minimum guarantee of 2 years but preferably longer. A maintenance plan is a desirable extra service we would like. The product should have been tested in accordance with BS EN 1177 and BS EN 7188. To remove existing equipment unless agreed otherwise and replace with new equipment with a significantly uplifted play value compared to the current playground. The area and equipment where possible should follow a jungle theme with a center piece designed to look like an elephant.
Zveřejněno
09.10.2025
Otevřeno k podání nabídek
09.10.2025
Termín
16.01.2026
Přiděleno
05.02.2026
Play Area Replacement at St Johns Open Space, Newton-le-Willows
Přiděleno·Oct 28
Bespoke Playground for Bouverie Square, Folkestone
Přiděleno·Oct 22
West Bridgford Playground Refurbishment - Toddler and Junior Area - The Hook Lady Bay
Přiděleno·Oct 19
ENQ1326
Přiděleno·Oct 14
Skateboard Park Remodelling
Otevřeno k podání nabídek·Oct 6
Whittle Street Play Area
Přiděleno·Oct 5
Accountancy Apprenticeships
Přiděleno·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Přiděleno·Oct 29
Transition and Exit Technical Support Service
Přiděleno·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Přiděleno·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Otevřeno k podání nabídek·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Přiděleno·Oct 29
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.