ASG has been commissioned to deliver the supply, installation, testing, and commissioning of access control systems, CCTV equipment, and associated infrastructure within the Tower Basement at Gloucestershire Royal Hospital. To support the safe and efficient delivery of these works, this related project involves the provision of a secure temporary site compound within the Gloucestershire Royal Hospital estate. The scope includes the supply, installation, maintenance, and subsequent removal of the compound, which will be used for the secure storage of materials, equipment, and tools required for the Tower Basement Access Control and CCTV project. The compound will provide a controlled and secure storage facility, helping to protect project assets, maintain site safety, reduce operational disruption, and support the timely delivery of the works. Upon completion of the project, the compound will be fully decommissioned and removed, with the area reinstated as required.
Termín
01.07.2026
Zveřejněno
17.07.2026
Přiděleno
17.07.2026
Lot 12 - Albert Street Play Area
Přiděleno·Sep 22
A66 Tees Dock Road Lackenby Access
Přiděleno·Sep 21
Willow House Enabling Works
Přiděleno·Aug 7
Oceansgate Phase 3.1 Enabling Works
Přiděleno·Jul 24
Old Westgate Station Hotel Development, Wakefield
Přiděleno·Jul 1
M6 Lune Gorge - Roundthwaite Box - Civils Package
Uzavřeno·Jun 25
Accountancy Apprenticeships
Přiděleno·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Přiděleno·Oct 29
Transition and Exit Technical Support Service
Přiděleno·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Přiděleno·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Otevřeno k podání nabídek·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Přiděleno·Oct 29
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.