Removal and replacement of the existing electrical panel boards at Cheltenham General Hospital, together with the provision of a temporary generator supply and installation of the new panel board and associated distribution board.
Zveřejněno
24.07.2026
Přiděleno
24.07.2026
Termín
25.07.2026
CA18576 - Electrical Maintenance. 4 Year Opportunity
Otevřeno k podání nabídek·Oct 16
WHC - Installations of Mains Isolator Switches. - AWARD
Přiděleno·Oct 9
Prj 1949 - Civic Centre Floor 7 LED Replacement of Light Fittings (Call-Off from TC-14 framework)
Přiděleno·Oct 8
GB-Kelvedon: ECFRS00447 Installation of Rapid Generator Connection Points and Associated Works
Přiděleno·Sep 25
HPFT - Warren Court New Mains Switch Panel Project
Přiděleno·Sep 22
CA18455 - R9309 Ferguson House Emergency Lighting
Uzavřeno·Sep 14
Accountancy Apprenticeships
Přiděleno·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Přiděleno·Oct 29
Transition and Exit Technical Support Service
Přiděleno·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Přiděleno·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Otevřeno k podání nabídek·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Přiděleno·Oct 29
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.