This procurement relates to the delivery of a geotechnical engineered design of a rockfall mitigation system along the vehicular access, adjacent to the Whakapapa Intake Structure.
Termín
31.10.2025
Zveřejněno
28.11.2025
Přiděleno
28.11.2025
327414 - STEM Blocks C–F Façade Concrete Panels Remediation
Uzavřeno·Sep 24
RFP - Northland Trades Services Panel for Suppliers of Roofing Projects & Maintenance Services
Uzavřeno·Aug 20
Ward Block Lift Upgrade- Dunedin Hospital
Uzavřeno·Aug 5
Ward Block Lift Upgrade- Dunedin Hospital
Uzavřeno·Jul 31
Te Pae Christchurch - Drape Line Automation
Přiděleno·Oct 31
2025/26 Central Waikato Pavement Rehabilitation (Foam Bitumen Stabilisation)
Přiděleno·Oct 11
PNCC - Waste Water Treatment Plant Seismic Strengthening
Otevřeno k podání nabídek·Oct 30
Panel of suppliers: Executive recruitment Services for public service chief executives and statutory officers
Otevřeno k podání nabídek·Oct 29
Herschell Street Carpark Redevelopment
Otevřeno k podání nabídek·Oct 29
Verran Primary School - Main Contractor for Covered Ways Demo, Alarm Replacements & Gas Decommissioning
Otevřeno k podání nabídek·Oct 29
Verran Primary School - Drain Laying Works for 6, 11, Site: Plumbing and Drainage – Plumbing and Drainage Works
Otevřeno k podání nabídek·Oct 29
Verran Primary School - Main Contractor for 1, 2, 3, 4, 6, 9, 11: Roofing
Otevřeno k podání nabídek·Oct 29
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.