The University of Waikato is undertaking remediation of the existing precast concrete façade panels to STEM Blocks C to F at the University’s Hamilton campus (the Project). The buildings and façade panels are over 50 years old. The Project aims to safely remediate identified cracking, spalling and reinforcement corrosion, address locations where concrete cover is below the original specified requirement, reduce the risk of further spalling, and extend the service life of the façade panels.
Zveřejněno
24.09.2026
Otevřeno k podání nabídek
24.09.2026
Termín
30.10.2026
323443 - Proposed UniRec New Build Project
Otevřeno k podání nabídek·Oct 4
327799 - Solar Installation Stage 2
Uzavřeno·Oct 1
327349 - Lift Replacement in MSB and G Block
Uzavřeno·Sep 18
319604 - Provision of Simulated Participants for Clinical Education and Assessment
Uzavřeno·Sep 8
322859 - Security Services
Uzavřeno·Aug 28
324523 - Enterprise CCTV Solution - Supply, Implementation, Migration and Support
Uzavřeno·Aug 28
RFP - Northland Trades Services Panel for Suppliers of Roofing Projects & Maintenance Services
Uzavřeno·Aug 20
Ward Block Lift Upgrade- Dunedin Hospital
Uzavřeno·Aug 5
Ward Block Lift Upgrade- Dunedin Hospital
Uzavřeno·Jul 31
Request for Proposal: Whakapapa Rockfall Mitigation
Přiděleno·Nov 28
Te Pae Christchurch - Drape Line Automation
Přiděleno·Oct 31
2025/26 Central Waikato Pavement Rehabilitation (Foam Bitumen Stabilisation)
Přiděleno·Oct 11
PNCC - Waste Water Treatment Plant Seismic Strengthening
Otevřeno k podání nabídek·Oct 30
Panel of suppliers: Executive recruitment Services for public service chief executives and statutory officers
Otevřeno k podání nabídek·Oct 29
Herschell Street Carpark Redevelopment
Otevřeno k podání nabídek·Oct 29
Verran Primary School - Main Contractor for Covered Ways Demo, Alarm Replacements & Gas Decommissioning
Otevřeno k podání nabídek·Oct 29
Verran Primary School - Drain Laying Works for 6, 11, Site: Plumbing and Drainage – Plumbing and Drainage Works
Otevřeno k podání nabídek·Oct 29
Verran Primary School - Main Contractor for 1, 2, 3, 4, 6, 9, 11: Roofing
Otevřeno k podání nabídek·Oct 29
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.