The Ōhineangaanga Stream Erosion Protection Works project involves the construction of a range of river and stream management measures designed to stabilise stream banks, reduce erosion, protect surrounding infrastructure, and improve the long-term resilience and environmental health of the stream corridor. The works include the excavation and reshaping of sections of the stream channel and banks, installation of rock riprap erosion protection, construction of retaining structures including sheet pile walls and reinforced earth walls, and the implementation of grade control and flow management features to help manage water movement and reduce further erosion. The project also includes the creation of low-flow channel features and access benches to support both stream function and ongoing maintenance activities. Environmental management is a key component of the project. Works will be undertaken within and around the stream environment, requiring the management of stream flows, protection of aquatic habitats, and maintenance of fish passage during construction. Following construction, disturbed areas will be reinstated and riparian planting undertaken to enhance ecological values and support the long-term stability of the stream banks. Overall, the project is intended to provide a sustainable erosion protection solution that safeguards nearby assets, enhances the resilience of the stream system, and delivers environmental improvements within the Ōhineangaanga Stream catchment.
Zveřejněno
20.08.2026
Otevřeno k podání nabídek
20.08.2026
Termín
18.09.2026
CON001926-G Whakatane Future Proof Stage 4A: Flood Gates
Uzavřeno·Oct 9
CON001927 - Whakatāne Project Future Proof - Stage 4B
Uzavřeno·Oct 1
CON001926 - Whakatane Project Future Proof - Stage 4A
Uzavřeno·Aug 3
Whakatāne Project Future Proof – Stage 3B
Uzavřeno·Jul 1
CON002038 Geothermal Drilling M30
Přiděleno·May 28
Eastern Bay of Plenty Bus Service
Přiděleno·Mar 24
746-27-261-PS - Kelston to New Lynn Cycling and Walking Connections
Uzavřeno·Oct 13
CON001926-G Whakatane Future Proof Stage 4A: Flood Gates
Uzavřeno·Oct 9
CON001927 - Whakatāne Project Future Proof - Stage 4B
Uzavřeno·Oct 1
Huntly West Domain Courts Renewal
Uzavřeno·Sep 18
CON001926 - Whakatane Project Future Proof - Stage 4A
Uzavřeno·Aug 3
Contract 922 Reseal Professional Services
Uzavřeno·Jul 30
PNCC - Waste Water Treatment Plant Seismic Strengthening
Otevřeno k podání nabídek·Oct 30
Panel of suppliers: Executive recruitment Services for public service chief executives and statutory officers
Otevřeno k podání nabídek·Oct 29
Herschell Street Carpark Redevelopment
Otevřeno k podání nabídek·Oct 29
Verran Primary School - Main Contractor for Covered Ways Demo, Alarm Replacements & Gas Decommissioning
Otevřeno k podání nabídek·Oct 29
Verran Primary School - Drain Laying Works for 6, 11, Site: Plumbing and Drainage – Plumbing and Drainage Works
Otevřeno k podání nabídek·Oct 29
Verran Primary School - Main Contractor for 1, 2, 3, 4, 6, 9, 11: Roofing
Otevřeno k podání nabídek·Oct 29
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.