Drilling is being undertaken by BOPRC at Boyes Park Reserve – Wylie Street, Rotorua and at Kuirau Park – Kuirau Street, Rotorua for our M-series and G-series monitoring and to further understand the geothermal and shallow geothermal/groundwater systems regarding recovery, recharge and sustainable allocation limits within the reservoir. The lithological information that is collected during the drilling of these bores’ feeds into the conceptual geological models, with this information the extent of each of our aquifers can be mapped. Once these bores are completed, they are being incorporated into BOPRC’s monitoring network where geothermal water levels, water temperature, water chemistry and isotope testing is regularly undertaken. During the drilling of the first bore BOPRC will be looking to collect additional information on the change in pH as drilling moves through the groundwater system and into the reservoir, this will be accompanied by regular temperature recording. A water sample of each of the
Termín
05.01.2026
Zveřejněno
28.05.2026
Přiděleno
28.05.2026
CON001926-G Whakatane Future Proof Stage 4A: Flood Gates
Uzavřeno·Oct 9
CON001927 - Whakatāne Project Future Proof - Stage 4B
Uzavřeno·Oct 1
Ohineangaanga Stream Remediation Work / Erosion Repairs
Uzavřeno·Aug 20
Ohineangaanga Stream Remediation Work / Erosion Repairs
Uzavřeno·Aug 19
CON001926 - Whakatane Project Future Proof - Stage 4A
Uzavřeno·Aug 3
Whakatāne Project Future Proof – Stage 3B
Uzavřeno·Jul 1
PNCC - Waste Water Treatment Plant Seismic Strengthening
Otevřeno k podání nabídek·Oct 30
Panel of suppliers: Executive recruitment Services for public service chief executives and statutory officers
Otevřeno k podání nabídek·Oct 29
Herschell Street Carpark Redevelopment
Otevřeno k podání nabídek·Oct 29
Verran Primary School - Main Contractor for Covered Ways Demo, Alarm Replacements & Gas Decommissioning
Otevřeno k podání nabídek·Oct 29
Verran Primary School - Drain Laying Works for 6, 11, Site: Plumbing and Drainage – Plumbing and Drainage Works
Otevřeno k podání nabídek·Oct 29
Verran Primary School - Main Contractor for 1, 2, 3, 4, 6, 9, 11: Roofing
Otevřeno k podání nabídek·Oct 29
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.