This tender is for the Design and Installation of completely new decks and parapet guardrails to be installed onto three of the existing historic steel railway bridges, bridges 59, 73 and 74, together with the removal and disposal of the existing timber decks and parapet guardrails on the same.
Termín
06.03.2026
Zveřejněno
03.08.2026
Přiděleno
03.08.2026
CWF Lot 2B - Roger Howe Concrete Repairs and Joint Replacement works Stage Two
Přiděleno·Oct 14
Nether Bridge Parapet Repairs
Přiděleno·Oct 6
Accountancy Apprenticeships
Přiděleno·Oct 29
Re-Location of Mobile Classroom - Berwick Academy
Přiděleno·Oct 29
Transition and Exit Technical Support Service
Přiděleno·Oct 29
CALL-OFF: Children's Services Re-Opening of the Open Select List 2025 for all Independent Placement
Přiděleno·Oct 29
Lead Designer, Architect, Conservation Architect, CDM Principal Designer and Building Safety Act Principal Designer
Otevřeno k podání nabídek·Oct 29
AOMR Lot 3 Wessex Routine Maintenance 26-27 - Stonbury Frome Desilting
Přiděleno·Oct 29
Vytvořte si účet, prozkoumejte tuto zakázku a najděte podobné příležitosti.